You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Is your feature request related to a problem? Please describe.
There should be default vendor configurations for costs.
Describe the solution you'd like
Vendor considerations IDT
Well defined length > cost and time estimates
TWIST
Produces adapter on each fragment. Primers must be ordered for assemblies in most cases. This optimization procedure is not implemented. For TWIST synthesized fragments, the cost would be equivalent to the synthesis cost + the cost of new primers. There may be optimizations to be had with ordering the TWIST fragment and ordering different primers to amplify the fragment.
The text was updated successfully, but these errors were encountered:
Is your feature request related to a problem? Please describe.
There should be default vendor configurations for costs.
Describe the solution you'd like
Vendor considerations
IDT
TWIST
The text was updated successfully, but these errors were encountered: