title | required data | layout | tags | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
IT FRESH-802 |
|
default |
|
Testcase to check if newly created flatrate terms for procurement are not autmatically completed.
-
Open bpartner window, search for G000X
-
Click Gear, Erzeuge Vertrag für gefilterte Geschäftsparter to create a flatrate term
-
Check the available flatrate terms in dropdown for Vertragsbedingungen:
- => Liefervereinbarung (Procurement) is NOT included
-
Open window Laufender Vertrag (flatrate_data), search for G000X
- => all flatrate terms for G000X are included in 2nd tab, Vertragsperiode (flatrate_term); if G000X has none yet, create one from bpartner
-
Select G000X, click Gear, Neuen Liefervertrag erstellen:
- => small window opens for setting the terms: product, time period, UOM etc.
- => checkbox Fertigstellen, to decide if the flatrate term should be completed right away
-
Select P0001, UOM, time period etc., don't check the box for Fertigstellen, OK:
- => new flatrate term for procurement is created, with the settings as selected
- => the flatrate term is NOT completed
-
Create another flatrate term, for G000X, with a different product P0002, time period etc., check the box for Fertigstellen, OK:
- => new flatrate term for procurement is created, with the settings as selected
- => the flatrate term is already completed