About project costs
About project costs
368b6f7a-4725-479c-bcdf-1a080aa06601
36056585
tonyafehr
daxcpft
04/18/2014
v=AX.60
capitalize cost
cost account
profit and loss
Application User
Global

About project costs

[!INCLUDEarchive-banner]

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

This topic provides an overview of how to configure Microsoft Dynamics AX to post project costs for hours and expenses to profit and loss accounts. This configuration is set up in the Project groups form.

Availability

  • License code: Project I

  • Configuration code: Basic (none)

How the account is applied

The following table shows how the account is applied.

Transaction type

Project type

Statement type

Hour

Time and material

Profit and loss

Expense

Fixed-price

Consumption

Parameter dependencies

In the Project groups form, on the Ledger FastTab, select Profit and loss in the Journalizing lists.

See also

Select accrued revenue for posting

Estimate (form)

Project groups (form)

Configuring line properties

Line properties (form)