You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Create a checklist of required items before Services Engineering group can sign off on accepting a new project.
e.g. (access to sources, issues, bugzilla; documentation is up-to-date; location of metrics, logs, dashboards; system topography chart; etc. Basically, all the things we would need to seamlessly operate and possibly improve a system. Yes, this will require the original team to do some work, not just throw a project over a wall and run like hell. If they do that, we sunset the project since we can't maintain it.)
The text was updated successfully, but these errors were encountered:
Create a checklist of required items before Services Engineering group can sign off on accepting a new project.
e.g. (access to sources, issues, bugzilla; documentation is up-to-date; location of metrics, logs, dashboards; system topography chart; etc. Basically, all the things we would need to seamlessly operate and possibly improve a system. Yes, this will require the original team to do some work, not just throw a project over a wall and run like hell. If they do that, we sunset the project since we can't maintain it.)
The text was updated successfully, but these errors were encountered: