You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
In the projects I work on, it is critical to be able to interpret two dates of imagery at the same time. This is because we use dot level information within the plots and it is essential to be able to compare and interpret two dates of imagery simultaneously in order to visually compensate for any image shift that exists between the two dates to ensure that what is being interpreted is at the same location in both images.
The text was updated successfully, but these errors were encountered:
In the projects I work on, it is critical to be able to interpret two dates of imagery at the same time. This is because we use dot level information within the plots and it is essential to be able to compare and interpret two dates of imagery simultaneously in order to visually compensate for any image shift that exists between the two dates to ensure that what is being interpreted is at the same location in both images.
The text was updated successfully, but these errors were encountered: