You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Feb 12, 2020. It is now read-only.
i examined my old favorite project, the sidewalk in san ysidro. (known as the old otay mesa road project). was wondering if there was value in identifying the amount of still needed for projects to be fully funded.
The text was updated successfully, but these errors were encountered:
Sign up for freeto subscribe to this conversation on GitHub.
Already have an account?
Sign in.
i examined my old favorite project, the sidewalk in san ysidro. (known as the old otay mesa road project). was wondering if there was value in identifying the amount of still needed for projects to be fully funded.
The text was updated successfully, but these errors were encountered: