There are N cities numbered from 1 to N.

You are given connections, where each connections[i] = [city1, city2, cost] represents the cost to connect city1 and city2 together.  (A connection is bidirectional: connecting city1 and city2 is the same as connecting city2 and city1.)

Return the minimum cost so that for every pair of cities, there exists a path of connections (possibly of length 1) that connects those two cities together.  The cost is the sum of the connection costs used. If the task is impossible, return -1.

 

Example 1:

Input: N = 3, connections = [[1,2,5],[1,3,6],[2,3,1]]
Output: 6
Explanation: 
Choosing any 2 edges will connect all cities so we choose the minimum 2.

Example 2:

Input: N = 4, connections = [[1,2,3],[3,4,4]]
Output: -1
Explanation: 
There is no way to connect all cities even if all edges are used.

 

Note:

  1. 1 <= N <= 10000
  2. 1 <= connections.length <= 10000
  3. 1 <= connections[i][0], connections[i][1] <= N
  4. 0 <= connections[i][2] <= 10^5
  5. connections[i][0] != connections[i][1]

Related Topics

[Union Find] [Graph] [Heap (Priority Queue)] [Minimum Spanning Tree]

Hints

Hint 1 What if we model the cities as a graph?
Hint 2 Build a graph of cities and find the minimum spanning tree.
Hint 3 You can use a variation of the Kruskal's algorithm for that.
Hint 4 Sort the edges by their cost and use a union-find data structure.
Hint 5 How to check all cities are connected?
Hint 6 At the beginning we have n connected components, each time we connect two components the number of connected components is reduced by one. At the end we should end with only a single component otherwise return -1.