Skip to content

Latest commit

 

History

History
24 lines (24 loc) · 1016 Bytes

Construction_utility.md

File metadata and controls

24 lines (24 loc) · 1016 Bytes

Prepare a container, Step by step

  1. Remove wooden floor
    Drill holes around screws, then pop out panels.
  2. Remove silicone joint
    Use 80 or 60 sanding disc with a grinder.
  3. Grind rust away
    Use 80 or 60 sanding disc with a grinder.
  4. Apply rust converter
    Paint the grinded spots with a rust converter.
    Clean grinded spots before applying the rust converter.
  5. Clean container
    Remove dust/dirt and rust converter leftovers from the surface.
    Like washing a car.
  6. Apply zink primer
    Paint zink primer on the grinded spots.
    Roughen the spots and clean with alcohol before painting.
  7. Seal floor with plates
    Make PET panels or buy PVC panels to install basic floor.
    Also find a way to seal of panels, ex. use molten HDPE/PET or similar to seal the openings.
  8. Basic floor
    Lay insulation matt (ca. 1cm Aerogel) on the floor
    Lay a rubber matt
  9. Standartized room
    Jam on Aluminium profiles into the container, to create a fixed sized room