Notifications
You must be signed in to change notification settings - Fork 0
/
process_modeling_code.m
318 lines (310 loc) · 12.6 KB
/
process_modeling_code.m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
% This function will take a desired conversion in reactor 1 (X_1), conversion in reactor 2 (X_2), T1, T2, P, and MR, and output all reactor sizes, an estimate for installation costs, and energy costs.
% It automatically adjusts feed rate so 63 kta of hydrogen is always produced and it will stop increasing reactor volume once a maximum conversion is reached.
% It also calculates NPV based on correlations for equipment sizes and other costs.
function [X1,X2,Reactor1Comp,Reactor2Comp,Vtot1,Vtot2,Reactor1Prod,Reactor2Prod,FT_1,FT_2,NPV,NPVP] = PlantSim(X_1,X_2,T1,T2,P,MR,dW,H2Price)
R1 = 8.314*10^(-3); %R constant for reaction kinetics
format shortEng
format compact
%% Information from Hysys
A1 = 649.3; %Area of each heat exchanger
%% Begin capacity loop
Capacity2 = 1;
err = 1;
iter = 0;
F1 = 1000;
while err > 0.001
%% Flowrates into first reactor
F1 = F1/Capacity2; %Flow rate of methane feed (mol/s)
F2 = F1*MR; %Inlet feed of H2O (mol/s)
W1 = 0; %Initial catalyst weight in reactor 1 (kg)
W2 = 0; %Initial catalyst weight in reactor 2 (kg)
FCH4 = 0.9963*F1; %molar flow of CH4
FCO2 = 0.0037*F1; %molar flow of CO2
FH2 = 0; %molar flow of H2
FCO = 0; %molar flow of CO
FH2O = F2; %molar flow of H2O
%% Define flow stream into Reactor 1
FCH4_1 = FCH4;
FH2O_1 = FH2O;
FH2_1 = FH2;
FCO_1 = FCO;
FCO2_1 = FCO2;
FT_1 = FCH4 + FH2O + FH2 + FCO2 + FCO;
MdotCH41 = (FCH4*16.04 + FH2*2.016 + FCO2*44.01 + FCO*28)*3600/1000;
MdotH2O1 = (FH2O*18.01)*3600/1000;
MdotR1in = (FCH4*16.04 + FH2*2.016 + FCO2*44.01 + FCO*28 + FH2O*18.01)*3600/1000;
w0CH4 = FCH4*16.04/MdotR1in*3600/1000;
w0H2O = FH2O*18.01/MdotR1in*3600/1000;
w0H2 = FH2*2.016/MdotR1in*3600/1000;
w0CO2 = FCO2*44.01/MdotR1in*3600/1000;
w0CO = FCO*28/MdotR1in*3600/1000;
%% Perform finite difference method to solve Reactor 1
X1 = 0;
while X1 < X_1
FT = FCH4 + FH2O + FH2 + FCO2 + FCO; % Recalculate total molar flow
PCH4 = (FCH4/FT)*P; %Recalculate all partial pressures
PCO = (FCO/FT)*P;
PH2O = (FH2O/FT)*P;
PH2 = (FH2/FT)*P;
PCO2 = (FCO2/FT)*P;
k1 = k_1(T1,R1); %Calculate rate constants at each point in reactor 1
k2 = k_2(T1,R1);
k3 = k_3(T1,R1);
K1 = K_1(T1);
K2 = K_2(T1);
KCO = K_CO(T1,R1); %Calculate equilibrium constants at each point in reactor 1
KH2 = K_H2(T1,R1);
KCH4 = K_CH4(T1,R1);
KH2O = K_H2O(T1,R1);
PSI = PSI_(KCO,KH2,KCH4,KH2O,PCO,PH2,PCH4,PH2O);
r1 = r_1(PSI,k1,K1,PH2,PCH4,PH2O,PCO); %Reaction rates at each point in reactor 1
r2 = r_2(PSI,k2,K2,PH2,PCO2,PH2O,PCO);
r3 = r_3(PSI,k3,K1,K2,PCH4,PH2,PCO2,PH2O);
FCH4 = FCH4 - r1*dW - r3*dW; %Change in all component molar flow rates
FH2O = FH2O - r1*dW - r2*dW - 2*r3*dW;
FCO = FCO + r1*dW - r2*dW;
FCO2 = FCO2 + r2*dW + r3*dW;
FH2 = FH2 + 3*r1*dW + r2*dW + 4*r3*dW;
X1 = (FCH4_1-FCH4)/(FCH4_1); %Define conversion of methane at each reactor size
if W1 > 300000
X_1 = X1;
break
end
W1 = W1 + dW;
end
%% Set up initial conditions flowing into reactor 2
FCH4_2 = FCH4;
FH2O_2 = FH2O;
FH2_2 = FH2;
FCO2_2 = FCO2;
FCO_2 = FCO;
Reactor1Prod = [FCH4_2 FH2O_2 FH2_2 FCO2_2 FCO_2];
FT_2 = FCO_2 + FH2_2 + FCO2_2 + FH2O_2 + FCH4_2;
y1CH4 = FCH4_2/FT_2;
y1H2O = FH2O_2/FT_2;
y1H2 = FH2_2/FT_2;
y1CO2 = FCO2_2/FT_2;
y1CO = FCO_2/FT_2;
Reactor1Comp = [y1CH4 y1H2O y1H2 y1CO2 y1CO];
MdotR1out = (FCH4*16.04 + FH2*2.016 + FCO2*44.01 + FCO*28 + FH2O*18.01)*3600/1000;
w1CH4 = FCH4*16.04/MdotR1out*3600/1000;
w1H2O = FH2O*18.01/MdotR1out*3600/1000;
w1H2 = FH2*2.016/MdotR1out*3600/1000;
w1CO2 = FCO2*44.01/MdotR1out*3600/1000;
w1CO = FCO*28/MdotR1out*3600/1000;
%% Solve Reactor 2 with finite difference
X2 = 0;
while X2 < X_2
FT = FCH4 + FH2O + FH2 + FCO2 + FCO; % Recalculate total molar flow
PCO = (FCO/FT)*P; %Recalculate all partial pressures
PCO2 = (FCO2/FT)*P;
PH2O = (FH2O/FT)*P;
PH2 = (FH2/FT)*P;
k4 = k_4(T2); %Calculate rate constants at each point in reactor 2
K2 = K_2(T2);
r4 = r_4(k4,K2,PCO,PH2O,PH2,PCO2); %Reaction rate in reactor 2
FH2O = FH2O - r4*dW; %Recalculate molar flow rates
FCO = FCO - r4*dW;
FCO2 = FCO2 + r4*dW;
FH2 = FH2 + r4*dW;
X2 = (FCO_2-FCO)/(FCO_2); %Define conversion of Carbon Monoxide
if W2 > 300000
X_2 = X2;
break
end
W2 = W2 + dW; %Add catalyst weight in each iteration
end
MdotR2out = (FCH4*16.04 + FH2*2.016 + FCO2*44.01 + FCO*28 + FH2O*18.01)*3600/1000;
w2CH4 = FCH4*16.04/MdotR2out*3600/1000;
w2H2O = FH2O*18.01/MdotR2out*3600/1000;
w2H2 = FH2*2.016/MdotR2out*3600/1000;
w2CO2 = FCO2*44.01/MdotR2out*3600/1000;
w2CO = FCO*28/MdotR2out*3600/1000;
FCH4_3 = FCH4;
FH2O_3 = FH2O;
FH2_3 = FH2;
FCO2_3 = FCO2;
FCO_3 = FCO;
Reactor2Prod = [FCH4_3 FH2O_3 FH2_3 FCO2_3 FCO_3];
FT_3 = FCO_3 + FH2_3 + FCO2_3 + FH2O_3 + FCH4_3;
y2CH4 = FCH4_3/FT_3;
y2H2O = FH2O_3/FT_3;
y2H2 = FH2_3/FT_3;
y2CO2 = FCO2_3/FT_3;
y2CO = FCO_3/FT_3;
Reactor2Comp = [y2CH4 y2H2O y2H2 y2CO2 y2CO];
FH2O_out = FH2O;
FH2O = 0;
MdotComp = (FCH4*16.04 + FH2*2.016 + FCO2*44.01 + FCO*28 + FH2O*18.01)*3600/1000;
wcompCH4 = FCH4*16.04/MdotComp*3600/1000;
wcompH2O = FH2O*18.01/MdotComp*3600/1000;
wcompH2 = FH2*2.016/MdotComp*3600/1000;
wcompCO2 = FCO2*44.01/MdotComp*3600/1000;
wcompCO = FCO*28/MdotComp*3600/1000;
FT_4 = FH2 + FCH4 + FCO2 + FCO; %Molar flow rate into compressor/PSA (mol/s)
%% Solve for size/mass of PSA
Phigh = 30*.987; %High PSA Pressure (atm)
Plow = 2*.987; %Low PSA Pressure (atm)
PCOhigh = Phigh*FCO/FT_4; %Partial pressure of CO into PSA (atm)
PCOlow = Plow*FCO/(FT_4-0.9*FH2); %Partial pressure of CO into PSA (atm)
T = 303; %Temp into PSA
fL = 0.95; %fraction of bed saturation
% Parameters for CO
k1 = 5.05;
k2 = -0.00905;
k3 = 0.001137;
k4 = 1617.0;
k5 = 0.5245;
k6 = 256.5;
n = k5 + k6/T;
B = k3*exp(k4/T);
qm = k1 + k2/T;
qH = (qm*B*PCOhigh^n)/(1+(B*PCOhigh^n));
qL = (qm*B*PCOlow^n)/(1+(B*PCOlow^n));
Mbed = (FCO)*300/((qH - qL)*fL); %mass of 1 PSA bed
VPSA = Mbed/795/.8; %volume of 1 PSA vessel (m^3)
LPSA = (VPSA*64/pi)^(1/3);
DPSA = .25*LPSA;
ProductH2 = 0.9*FH2; %Hydrogen production rate (mol/s)
Exhaust = FCO2; %All CO2 goes into exhaust
FH2_out = 0.1*FH2;
FCO_out = FCO;
FCH4_out = FCH4;
Capacity = ProductH2/1033.399; %Fraction of desired H2 product
err = abs(Capacity-1);
Capacity2 = Capacity;
iter = iter + 1;
end
%% Energy Balances for Costing
Reactor1W = 1000*(-241.83*(FH2O_2 - FH2O_1) - 393.51*(FCO2_2 - FCO2_1)...
- 110.53*(FCO_2 - FCO_1) - 74.87*(FCH4_2 - FCH4_1)); %Energy to heat reactor 1 (W)
Reactor2W = -1000*(-241.83*(FH2O_3 - FH2O_2) - 393.51*(FCO2_3 - FCO2_2)...
- 110.53*(FCO_3 - FCO_2) - 74.87*(FCH4_3 - FCH4_2)); %Energy to cool reactor 1 (W)
PreHeaterW = (T1 - 298)*(35.69*FCH4_1 + 43.7934*FCO2_1 + 29.24*FH2_1); %Energy to heat methane feed to T1 (W)
BoilerW = 40700*FH2O_1 + 75.6*(212.5-80.7)*FH2O_1 + (380 - 212.5)*36.5*FH2O_1; %Energy to boil water in feed to steam at 380 Deg C (W)
ThermalW = BoilerW + PreHeaterW + Reactor1W;
FlashDrumW = (219-100)*(36.5*FH2O_3 + 35.69*FCH4_3 + 43.7934*FCO2_3 + 29.24*FH2_3 + 29.15*FCO_3) + 40700*FH2O_3; %Energy to cool stream and condense water (W)
CompressorBHP = (3.3*10^(-5)/.254)*P*14.5038*(FT_4*8.314*10^(-5)*373/P)*60*35.3147*((30/P)^.254 - 1)/.85; %BHP of compressor before PSA
CoolingWaterGJ = (FlashDrumW + Reactor2W)*3600*24*350/(10^9); %GJ of cooling water per year (GJ/year)
PumpW = 50150/1107.8*F2; %Pump duty (W)
%% Reactor Sizing Parameters
pcat = 1000; %Bulk density of catalyst (kg/m^3)
Vtot1 = W1/pcat; %Total Reactor 1 volume (m^3)
Vtot2 = W2/pcat;%Total Reactor 2 volume (m^3)
L1 = (Vtot1*20^2/pi)^(1/3); %Reactor 1 length (m) (assumes 10:1 aspect ratio)
Dr1 = .1*L1; %Reactor 1 Diameter (m) (assumes 10:1 aspect ratio)
L2 = (Vtot2*20^2/pi)^(1/3); %Reactor 2 length (m) (assumes 10:1 aspect ratio)
Dr2 = .1*L2; %Reactor 2 Diameter (m) (assumes 10:1 aspect ratio)
%% Variable Costs
H2Energy = 1000*286*FH2_out; %Energy released by burning excess H2 (W)
COEnergy = 1000*294*FCO_out; %Energy released by burning excess CO (W)
CH4Energy = 1000*890*FCH4_out; %Energy released by burning excess CH4 (W)
EffluentW = H2Energy + COEnergy + CH4Energy; %Total energy from burning all effluent (W)
EffluentCO2 = FCO_out + FCH4_out; %Total CO2 from burning all effluent (mol/s)
EnergyRatio = ThermalW/EffluentW; %Decides if more methane is needed for furnaces
if EnergyRatio < 1
FurnaceCO2 = EnergyRatio*EffluentCO2;
ThermalCost = 0; % Cost of thermal energy for furnaces ($/year)
else
MethaneBurned = (ThermalW - EffluentW)/890000; %Total Methane burned in furnaces (mol/s) (discounts energy from burned effluent)
FurnaceCO2 = MethaneBurned + EffluentCO2; %CO2 Produced by furnaces (mol/s)
ThermalCost = (ThermalW - EffluentW)/1000000*10*24*350; % Cost of thermal energy for furnaces ($/year)
end
TotalElectricityW = CompressorBHP*745.7 + PumpW; %Total Electricity Usage (W)
ElectricityCO2 = 1.512*10^(-12)*TotalElectricityW; %CO2 Produced from Elec. (mol/s)
ElectricityCO2Cost = 8.8*10^(-3)*ElectricityCO2*3600*24*350; %Additional CO2 Cost from heaters ($/year)
FurnaceCO2Cost = 8.8*10^(-3)*FurnaceCO2*3600*24*350; %Additional CO2 Cost from heaters ($/year)
CO2Cost = 4.4*10^(-3)*Exhaust*3600*24*350 + FurnaceCO2Cost + ElectricityCO2Cost; %Total cost of sequestration ($/year)
FeedCost = .001879*F1*3600*24*350; %Cost of Methane Feed ($/year)
SteamFeedCost = .05*18.01/1000000*F2*3600*24*350; %Cost of Water Feed @ $0.05 per MT ($/year)
H2Revenue = H2Price/1000000*2.016*ProductH2*3600*24*350; %Income for H2 ($/year)
CoolingWaterCost = CoolingWaterGJ*2; %Cost of all cooling water ($/year)
CompressorElectricity = CompressorBHP*745.7/1000000*50*24*350; %Electricity powering compressor 1 ($/year)
PumpElectricity = PumpW/1000000*50*24*350; %Water pump electricity cost
WasteWaterCost = FH2O_out*3600*24*350*18.01/1000000*1.25; %Wastewater treatment cost ($/year)
AllCosts = [ThermalCost WasteWaterCost CO2Cost FeedCost SteamFeedCost CoolingWaterCost CompressorElectricity PumpElectricity]; %Vector of all variable costs
%% Fixed Costs
Fp = 1;
Fm = 1;
Fc = Fm*Fp;
PreHeaterBTU = PreHeaterW*3.412/1000000;
Reactor1BTU = Reactor1W*3.412/1000000;
BoilerBTU = BoilerW*3.412/1000000;
Reactor1IC = (1650/280)*(101.9*((Dr1*3.28)^1.066)*((L1*3.28)^.82))*(2.18+Fc);
Reactor2IC = (1650/280)*(101.9*((Dr2*3.28)^1.066)*((L2*3.28)^.82))*(2.18+Fc);
FeedFurnaceIC = (1650/280)*(5.52*10^3)*(PreHeaterBTU^0.85)*(1.27+Fc); % Pre-Reactor Furnace Installed Cost
BoilerIC = (1650/280)*(5.52*10^3)*(BoilerBTU^0.85)*(1.27+Fc);
Reactor1FurnaceIC = (1650/280)*(5.52*10^3)*(Reactor1BTU^0.85)*(1.27+Fc); % Reactor Furnace Installed Cost
CompressorIC = (1650/280)*517.5*CompressorBHP^.82*(2.11+Fc); %Installed cost of compressor 1
PSAIC = 4*(1650/280)*101.9*(DPSA*3.28)^1.066*(LPSA*3.28)^0.82*(3.18 + Fc) + 5*4*Mbed; %IC of 4 PSA tanks
HeatExchangerIC = (1650/280)*101.3*A1^.65*(2.29+Fc);
HeatExchangersIC = 16*HeatExchangerIC;
CatalystCost = (W1+W2)*30*3;
AllIC = [PSAIC Reactor1IC Reactor2IC FeedFurnaceIC BoilerIC Reactor1FurnaceIC CompressorIC HeatExchangersIC]; %Vector of all Installation Costs ($)
%% NPV Calculations
ISBL = sum(AllIC); %Total installation cost ($)
PR = H2Revenue; %AARON - annual product revenue ($/yr)
VC = sum(AllCosts);%AARON - annual cost of feedstock ($/yr)
FC = ISBL;
PBT = H2Revenue - sum(AllCosts);
Sigma = 6.8137;
a = 4.1107;
b = -0.3498;
c = 0.2936;
d = -2.06;
e = 3.4057;
f = 7.011;
g = 1.177;
h = 1.214;
k = 12;
TCI = h*FC;
ROIbt = PBT/TCI;
NPV = a*PBT+b*FC;
NPVP = c*ROIbt+d;
end
%% Functions for finding kinetic parameters
function k1 = k_1(T,R)
k1 = 0.04*2.763*10^(-6)*exp((-240.1/R)*(1/T - 1/648));
end
function k2 = k_2(T,R)
k2 = 0.04*.11337*exp((-67.13/R)*(1/T - 1/648));
end
function k3 = k_3(T,R)
k3 = 0.04*3.289*10^(-7)*exp((-243.9/R)*(1/T - 1/648));
end
function k4 = k_4(T)
k4 = 3.33*10^(-8)*exp(12.88-1855.5/T);
end
function K1 = K_1(T)
K1 = exp(-26830/T + 30.114);
end
function K2 = K_2(T)
K2 = exp(4400/T - 4.036);
end
function KCO = K_CO(T,R)
KCO = 40.91*exp((70.65/R)*(1/T - 1/648));
end
function KH2 = K_H2(T,R)
KH2 = 0.0296*exp((82.9/R)*(1/T - 1/648));
end
function KCH4 = K_CH4(T,R)
KCH4 = 0.1791*exp((38.28/R)*(1/T - 1/823));
end
function KH2O = K_H2O(T,R)
KH2O = 0.4152*exp((-88.68/R)*(1/T - 1/823));
end
function PSI = PSI_(KCO,KH2,KCH4,KH2O,PCO,PH2,PCH4,PH2O)
PSI = 1 + KCO*PCO + KH2*PH2 + KCH4*PCH4 + (KH2O*PH2O/(PH2+.01));
end
function r1 = r_1(PSI,k1,K1,PH2,PCH4,PH2O,PCO)
r1 = (k1/((PH2+.01)^2.5 * PSI^2))*(PCH4*PH2O - (PH2^3 * PCO/K1));
end
function r2 = r_2(PSI,k2,K2,PH2,PCO2,PH2O,PCO)
r2 = (k2/((PH2+.01)*PSI^2))*(PCO*PH2O - (PH2*PCO2/K2));
end
function r3 = r_3(PSI,k3,K1,K2,PCH4,PH2,PCO2,PH2O)
r3 = (k3/((PH2+.01)^3.5*PSI^2))*(PCH4*PH2O^2 - (PH2^4*PCO2/(K1*K2)));
end
function r4 = r_4(k4,K2,PCO,PH2O,PH2,PCO2)
r4 = k4*PCO*PH2O*(1-(PH2*PCO2/(K2*PCO*PH2O)));
end