Welcome to the PyPSA-PL repository! PyPSA-PL is a set of scripts and data that can be used with the PyPSA open energy modelling framework to analyze the mechanics of the Polish power system. The model includes a unit-by-unit representation of thermal power plants, a 75-200 node 400/220 kV transmission grid, a spatial distribution of renewables based on the most comprehensive assessment available, a detailed forecast of capacity increases across several technologies based on the existing and planned project pipeline.

PyPSA-PL was created by the Instrat Foundation and described in a trilogy of publications about the Polish coal phase-out:

  1. Czyżak, P., Wrona, A. (2021). Achieving the goal. Coal phase-out in Polish power sector. Instrat Policy Paper 01/2021. https://instrat.pl/en/coal-phase-out/
  2. Czyżak, P., Sikorski, M., Wrona, A. (2021). What’s next after coal? RES potential in Poland. Instrat Policy Paper 06/2021. https://instrat.pl/en/res-potential/
  3. Czyżak, P., Wrona, A., Borkowski, M. (2021). The missing element. Energy security considerations. Instrat Policy Paper 09/2021. https://instrat.pl/en/energy-security/

Citation and license

The recommended citation is:

Czyżak, P., Mańko, M., Sikorski, M., Stępień, K., Wieczorek, B. (2021). PyPSA-PL - An open energy model of the Polish power sector based on the PyPSA framework. Instrat. https://github.com/instrat-pl/pypsa-pl

PyPSA-PL is based on the PyPSA open energy modelling framework used by many research institutions around the world. Whenever using PyPSA-PL, please also give credit to the authors of PyPSA following the guidelines described in the PyPSA documentation.

Similarly to PyPSA, PyPSA-PL is distributed under the MIT license.

Setup

To use the model you will need to have a basic understanding of Python, conda and PyPSA, an LP solver and a high performance computer with enough memory (32 GB RAM for the simplified 400kV network, 64 GB for the full 220 kV network). It is possible to run the model with an open solver, but the performance might not be satisfactory. In case of lacking hardware resources, it is possible to run the model using a virtual machine e.g. hosted in Azure. You can also run single days instead of a full year to improve solving time.

Before you start working with PyPSA-PL, please follow the installation guidelines for PyPSA.

In the PyPSA-PL repository you will find a requirements.txt file that can be used to set up a conda environment. You will notice that this file downloads the 0.17.0 version of the pypsa package - that is the version used to create PyPSA-PL. There were significant changes introduced in PyPSA 0.18.0, but the PL version has not be upgraded yet.

The basic installation steps can be summarized as follows:

  1. Clone the PyPSA-PL repository
  2. Create a new conda environment with Python 3.7.7 (conda create -n pypsa-pl python=3.7.7)
  3. Install an LP solver (make sure it is available in the Python terminal)
  4. Install the PyPSA package and all dependencies

Getting started

PyPSA-PL is a set of scripts and spreadsheets that can be used to generate inputs for the actual PyPSA framework. After you complete the installation procedure, it is relatively easy to get some first results:

  1. Open the prepare_input_files script in the pypsa-pl folder using your IDE (preferably open the IDE in Admin mode).
  2. Set the scenario_name and reference_year. The available scenarios are instrat and pep2040, the input data is provided for years 2020, 2021, 2025, 2030, 2035, 2040. It is necessary to run each year separately.
  3. Save the file and run it (if an error pops up, make sure the terminal points to the correct directory).
  4. This will create the PyPSA input data in your pypsa-pl/pypsa/scenario_name/data/reference_year/ folder.
  5. Open the run_pypsa_lopf script in the pypsa-pl folder using your IDE
  6. Set the solver name in line 155 (where the network.lopf function is called). See the PyPSA documentation for a list of compatible solvers.
  7. Save the file and run it.
  8. Once the optimization is finished, the results will be placed in your pypsa-pl/pypsa/scenario_name/results/reference_year/ folder. (if you see an error complaining about the directory being not accessible, create the results folder manually)

Accessing the results

You can look at the basic generation, SRMC and emissions data provided in csv files, but the recommended way of processing results is by using the network.nc file. To do that, open a jupyter notebook, create a new pypsa.Network() object and import the data into it using the import_from_netcdf() function. An example is shown below.

Import the network from the netCDF file:

network_2040 = pypsa.Network()
network_2040.import_from_netcdf('pypsa/instrat/results/2040/network.nc')

Access the model outputs, e.g. the generation by carrier:

network_2040.generators_t.p.group by(network_2040.generators.carrier, axis=1).sum().sum()

You can find several examples of processing results in the PyPSA documentation.

Model design

Two scenarios are provided with PyPSA-PL:

  • Instrat - based on Instrat's own unit-by-unit coal phase-out schedule, with detailed year-by-year RES forecasts. The scenario is described in detail in the What’s next after coal? RES potential in Poland paper.
  • PEP2040 - based on the official Polish Energy Policy until 2040. Since that only provides aggregated capacity and generation by fuel values, a unit-by-unit decommissioning schedule for coal plants was generated. The expansion plans for other technologies were proposed as well based on the currently available knowledge (e.g. the placement of gas plants, nuclear units etc.). In this scenario the imports are disabled, following the reasoning described in PEP2040.

Please note that PyPSA-PL is not configured as a capacity expansion model (CEM), but rather a merit-order style dispatch model. The installed capacity for different technologies is provided manually as part of the scenario design. This decision was made to ensure that the Instrat scenario is technically, politically, socially, economically viable in each given year, while also following a dispatching procedure similar to the one performed by the TSO. Running the model as a CEM means the capacity additions are set by the optimizer and do not always correspond to reality. It is possible to set the CAPEX values for each technology and convert PyPSA-PL to a CEM, but that may require some programming work by the user.

PyPSA-PL contains a full representation of the Polish 400 kV transmission network and a simplified representation of 220 kV lines, with a total of 75 nodes. You can also run the model using the full 220 kV network by using the lines_380and220 tab in the lines.xlsx file and buses_380and220 in the buses.xlsx file, but that will increase the node count to 200 and require at least 64 GB of RAM on your computer.

Each node of the network has some load attached to it, as well as distributed generators (e.g. wind farms, PV) and possibly utility-scale generation units (coal, gas plants etc.). The load and RES spatial resolution is set on a voivodeship level and then disaggregated proportionally onto the nodes in the given voivodeship.

Only the Polish transmission network is modelled, with existing cross-border links provided but no representation of the European transmission network. The link capacities are set to real values, which limits the peak imports. The actual imports are determined by the prices in other countries and these will translate to aggregated net import volumes in a given year. The import prices were calibrated using 2020 values and then adapted to keep them above the SRMC of Polish gas units in the future (it is most likely that if RES generation is low in Poland, it will be low in some neighbouring countries as well and the national gas units will set the merit order price).

Changing input parameters

To change the scenarios, access the files located in the inputs folder. Files shared across scenarios are placed in the main directory, additionally, each scenario will have a dedicated folder.

The scenario-specific files are:

  • cbf_links - the capacities for cross-border connections. These were designed based on entso-e data about the currently planned network expansion projects.
  • scenario - the installed capacity for distributed generators, as well as prices, demand projections and constants. This will be the main file to modify while building your own scenario, especially via changing the capacity projections for distributed RES technologies.
  • utility_units - parameters for large generators like coal units, CHPs, gas plants, offshore wind farms. Modifying this file requires more knowledge - you need to define the parameters for each specific unit.

The shared files are:

  • buses - a list of network buses, for both the standard 400kV network and the full 220kV network
  • capacity_factors - the wind and solar generation in each hour of the year (and across voivodeships), the generalized CHP generation profile (to account for the fact that CHP units have limited availability in the summer)
  • buses - a list of network buses, for both the standard 400kV network and the full 220kV network
  • installed_capacity_distribution - the spatial placement of distributed generator capacity (onshore wind, PV, small-scale batteries, industrial units) across voivodeships
  • lines - a list of network lines per year - the lines are expanded according to the TSO's plans for 2030 and Instrat's forecast to accommodate increased RES deployment. See the report: The missing element for more details on the methodology.
  • load_decomposition_over_voivodeships_2019 - the distribution of load across Polish voivodeships (this is the most detailed officially provided load disaggregation)
  • load_hour_factors_2019 - the hourly demand profile in 2019 - this is scaled for future years using the yearly demand projections from PEP2040. The year 2019 was chosen because the demand in 2020 was strongly impacted by the COVID-19 pandemic.
  • wojewodztwa-max - a .geojson file with the Polish voivodeships, these are used to map network nodes with demand and RES generation values

Once changes have been made, you need to re-generate the pypsa inputs using prepare_input_files script and then run the optimization using run_pypsa_lopf.

You can look at the pypsa/scenario_name/data folder contents to diagnose any data issues.

Further improvements

We are aware that many improvements need to be made in the PyPSA-PL model, some of them include:

  • Heating - including heat demand in the model and proposing a full coal-to-X conversion scheme for existing CHP plants;
  • Hydrogen - including electrolyzers in the model, which could allow for a more detailed assessment of using RES energy surpluses for green hydrogen generation
  • EU-wide network - improving the representation of the European-wide transmission network and the cross-border flows by adding at least a single node per country, with capacity expansion projections based on e.g. the NECP's;
  • Coal unit flexibility - adding ramp-up/down and minimum utilization constraints. This was removed from the model due to the significant increase in model complexity and solving times, but it is possible to implement these constraints in the utility_units input file;
  • Demand and RES disaggregation - both load and RES distribution are defined on voivodeship level. These could be disaggregated onto the network nodes using a more sophisticated approach - e.g. taking into account population density, economic activity, industry etc.;
  • Demand from other sectors - the demand projection for 2020-2040 comes from the Polish TSO (also included in PEP2040). It is very likely that the electrification of transport and heating will lead to even higher electricity demand increases;
  • Line loading - to ensure an even distribution of line loading with the simplified 220 kV network, the resistance and reactance of 220 kV lines was changed in the line_types file in core PyPSA. This is not an ideal solution and should be handled in the PyPSA-PL code;
  • Thermal unit maintenance schedule - the Polish coal units are extremely prone to outages due to their age. This is not represented in the model and could mean that the availability of coal plants is higher than in reality. A maintenance schedule and a random outage algorithm could be included to represent the actual working conditions of coal plants;

You are welcome to expand and modify PyPSA-PL according to your needs (honoring the license - see Citation and license section). You can also submit pull requests onto the PyPSA-PL repository, but due to a lack of resources we cannot ensure we will be able to review and approve those.

References

Please look at the Instrat Policy Papers cited in the Introduction for a detailed list of sources and a description of the methodology, the scenario design assumptions, price parameters etc.

The most significant model references are listed below:

About

No description, website, or topics provided.

Resources

License

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Languages

  • Python 100.0%