Meet Colm on Monday 31/01/2022 2:30pm in CQ-LG02 Lab #4

Closed
talhatallat opened this issue Jan 31, 2022 · 1 comment
Closed

Meet Colm on Monday 31/01/2022 2:30pm in CQ-LG02 Lab #4

talhatallat opened this issue Jan 31, 2022 · 1 comment
Assignees

Comments

@talhatallat
Copy link
Owner

  • Discussed the safety and hazards of the project.

  • Brainstorm the project

  • Preliminary report checkup (more attention is required on project objectives)

  • Met lab coordinator to work in the lab in the future under supervision while working above 50v and high currents.

  • Required the following by Colm before Wednesday to check missing details:

    1. Preliminary report
    2. Safety Document
@talhatallat talhatallat self-assigned this Jan 31, 2022
@talhatallat talhatallat added help wanted Extra attention is needed and removed help wanted Extra attention is needed labels Jan 31, 2022
@talhatallat
Copy link
Owner Author

Metting was successfully completed. Few adjustments showed up in the project preliminary report which required to be fixed.