Add transfer capacties for Norway #1861

Merged
merged 2 commits into from
May 22, 2019
Merged

Conversation

Gazer75
Copy link
Contributor

@Gazer75 Gazer75 commented May 19, 2019

Values are based on max reported to ENTSOE and will obviously be lower in summer due to thermal limits.

Values are based on max reported to ENTSOE and will obviously be lower in summer due to thermal limits.
@corradio
Copy link
Member

corradio commented May 21, 2019

I'll let @alixunderplatz double check as he's really the expert :D

@Gazer75
Copy link
Contributor Author

Gazer75 commented May 21, 2019

That's ok. This could be done for all countries within ENTSOE area that report this. I was a bit unsure about the NO<->SE due to the missing proper regions for SE.

@alixunderplatz
Copy link
Collaborator

@corradio hehe thanks^^
In general, we have already added such AC-tie line capacities in Australia, but in that case, they were dynamic. Transmission capacities can be shifted with generation and demand in the respective areas and also with availability of transmission lines and power plants.
I think it's okay to use the AC-transmission capacity for the interconnections between the zones here. But in this case, they are static, and in reality they will probably change over time, as @Gazer75 also mentioned. But as you can see on the different figures for the same interconnectors, imports/exports to some areas are limited in certain directions, which is what is important. I approve ;)
I don't have the time to look into NO<->SE, I guess we will see if it fits or not.^^

Parsing these transmission capacities from ENTSO-E in the future really could be an option, but let's discuss this in another issue.

@Gazer75
Copy link
Contributor Author

Gazer75 commented May 21, 2019

I was thinking the same. A parser might be able to read this as most are reported daily or monthly to ENTSO-E. It would also make it more accurate through the year.

@corradio corradio merged commit ead81ea into electricitymaps:master May 22, 2019
@Gazer75 Gazer75 deleted the patch-1 branch May 22, 2019 07:43
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

None yet

3 participants