This unit model is formulated as a pass-through model form. See documentation for :ref:`pass-through Helper Methods<pt_methods>`.
Electricity consumption is calculated using the constant_intensity helper function. See documentation for :ref:`Helper Methods for Electricity Demand<electricity_methods>`.
Costing is calculated using the :py:meth:`~watertap.unit_models.zero_order.landfill_zo.LandfillZOData.cost_landfill` method. For full details on costing, see documentation for the :ref:`zero-order costing package<zero_order_costing>`.
Description | Variable Name | Units |
---|---|---|
capacity basis for capital cost | capacity_basis | kg/h |
total mass flow rate | total_mass | kg/h |
Description | Constraint Name |
---|---|
Total mass constraint | total_mass_constraint |
.. index:: pair: watertap.unit_models.zero_order.landfill_zo;landfill_zo
.. currentmodule:: watertap.unit_models.zero_order.landfill_zo
.. automodule:: watertap.unit_models.zero_order.landfill_zo :members: :noindex: