Skip to content

Pull requests: cert-manager/cert-manager

Author
Filter by author
Label
Filter by label
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Milestones
Filter by milestone
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

Remove unnecessary check of common name at order creation to allow ip only certificates with common name. area/acme Indicates a PR directly modifies the ACME Issuer code dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#7081 opened Jun 7, 2024 by johnjcool Loading…
[CI] Merge self-upgrade-master into master dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. do-not-merge/release-note-label-needed Indicates that a PR should not merge because it's missing one of the release note labels. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#7072 opened Jun 6, 2024 by github-actions bot Loading…
Enable Helm values.yaml jsonschema validation area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. kind/feature Categorizes issue or PR as related to a new feature. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#7069 opened Jun 5, 2024 by inteon Loading…
WIP: Validates secret against certificate before secret reconciliation/update by issuing controller dco-signoff: no Indicates that at least one commit in this pull request is missing the DCO sign-off message. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. kind/bug Categorizes issue or PR as related to a bug. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#7064 opened Jun 3, 2024 by TrilokGeer Loading…
Make it possible to split a cert-manager installation over multiple Helm releases. area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. do-not-merge/release-note-label-needed Indicates that a PR should not merge because it's missing one of the release note labels. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#7061 opened May 31, 2024 by FR-Solution Loading…
Add default k8s sa aud dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#7060 opened May 31, 2024 by andrey-dubnik Loading…
Startupapicheck: validate that the validating and mutating webhooks are doing their job area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. kind/bug Categorizes issue or PR as related to a bug. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#7057 opened May 29, 2024 by inteon Loading… 1.16
Add secret_name to prometheus metrics area/monitoring Indicates a PR or issue relates to monitoring area/testing Issues relating to testing dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. kind/feature Categorizes issue or PR as related to a new feature. ok-to-test release-note Denotes a PR that will be considered when it comes time to generate release notes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#7042 opened May 21, 2024 by 1mamute Loading…
Feature/5514 - Add SecretRef support for venafi TPP issuer CA Bundle area/api Indicates a PR directly modifies the 'pkg/apis' directory area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#7036 opened May 16, 2024 by sankalp-at-gh Loading…
feat: Add renewBeforePercentage alternative to renewBefore approved Indicates a PR has been approved by an approver from all required OWNERS files. area/api Indicates a PR directly modifies the 'pkg/apis' directory area/deploy Indicates a PR modifies deployment configuration area/testing Issues relating to testing dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. kind/feature Categorizes issue or PR as related to a new feature. ok-to-test release-note Denotes a PR that will be considered when it comes time to generate release notes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#6987 opened May 4, 2024 by cbroglie Loading… 1.16
Skip gateway TLS listener in passthrough mode dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#6986 opened May 4, 2024 by vehagn Loading…
Set GOMAXPROCS and GOMEMLIMIT environment variables area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. kind/feature Categorizes issue or PR as related to a new feature. ok-to-test release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#6977 opened Apr 30, 2024 by jnoordsij Loading… 1.16
Add process and go runtime metrics for controller area/monitoring Indicates a PR or issue relates to monitoring dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. kind/feature Categorizes issue or PR as related to a new feature. ok-to-test release-note Denotes a PR that will be considered when it comes time to generate release notes. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#6966 opened Apr 27, 2024 by mindw Loading…
Specify resources for acme pods per issuer area/acme/http01 Indicates a PR modifies ACME HTTP01 provider code area/acme Indicates a PR directly modifies the ACME Issuer code area/api Indicates a PR directly modifies the 'pkg/apis' directory area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#6902 opened Apr 12, 2024 by nabokihms Loading…
feat: Host Network - Enable support in Deployment via values area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#6900 opened Apr 12, 2024 by mihaigalos Loading…
🐛 Remove extra space/line from cert-manager release manifest area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. do-not-merge/release-note-label-needed Indicates that a PR should not merge because it's missing one of the release note labels. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. ok-to-test size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#6849 opened Mar 12, 2024 by kashifest Loading…
use release namespace for leader election area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#6766 opened Feb 19, 2024 by aburan28 Loading…
Move the cainjector controller to its own directory area/testing Issues relating to testing dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. kind/cleanup Categorizes issue or PR as related to cleaning up code, process, or technical debt. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#6731 opened Feb 8, 2024 by inteon Loading…
feat: add annotations on RBACs area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#6722 opened Feb 6, 2024 by darkweaver87 Loading…
Allow to set keystore password in Certificate area/api Indicates a PR directly modifies the 'pkg/apis' directory area/deploy Indicates a PR modifies deployment configuration area/testing Issues relating to testing dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. ok-to-test release-note Denotes a PR that will be considered when it comes time to generate release notes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#6657 opened Jan 19, 2024 by rquinio1A Loading…
Allow customizing labels copied from ingresses to certificates area/api Indicates a PR directly modifies the 'pkg/apis' directory dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#6576 opened Dec 29, 2023 by kwohlfahrt Loading…
Update Certificates with Ingress annotations dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. kind/bug Categorizes issue or PR as related to a bug. ok-to-test release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#6567 opened Dec 21, 2023 by anothertobi Loading…
First draft of e2e test to try to reproduce same domain multiple orders race condition area/testing Issues relating to testing dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. ok-to-test release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#6516 opened Nov 25, 2023 by Git-Jiro Loading…
Issue 5514 read cabundle from kube objects - design doc dco-signoff: no Indicates that at least one commit in this pull request is missing the DCO sign-off message. kind/design Categorizes issue or PR as related to design. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#6228 opened Jul 21, 2023 by AppalaKarthik Loading… 1.16
Remove conflicting labels from CRDs area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#6192 opened Jun 29, 2023 by gw0 Loading…
ProTip! Find all pull requests that aren't related to any open issues with -linked:issue.