-
Notifications
You must be signed in to change notification settings - Fork 242
Pull requests: metal3-io/baremetal-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
🌱 [backport] Workflow pipeline with unit tests
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
🌱 [backport] Workflow pipeline with unit tests
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#1772
opened Jun 5, 2024 by
lentzi90
Loading…
🌱 E2E: Run as github workflow
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#1771
opened Jun 5, 2024 by
lentzi90
Loading…
[WIP] 🌱 Add new go library to create new bmc and bmh
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#1767
opened Jun 4, 2024 by
mquhuy
Loading…
🌱 Bump golangci/golangci-lint-action from 5.1.0 to 6.0.1
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
dependencies
Pull requests that update a dependency file
github_actions
Pull requests that update GitHub Actions code
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#1757
opened Jun 1, 2024 by
dependabot
bot
Loading…
🌱 Bump actions/checkout from 4.1.4 to 4.1.6
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
dependencies
Pull requests that update a dependency file
github_actions
Pull requests that update GitHub Actions code
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#1755
opened Jun 1, 2024 by
dependabot
bot
Loading…
🌱 Remove hack/tools go module
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
needs-rebase
Indicates that a PR cannot be merged because it has merge conflicts with HEAD.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#1753
opened May 30, 2024 by
mquhuy
Loading…
🌱 Bump github.com/go-logr/logr from 1.4.1 to 1.4.2
dependencies
Pull requests that update a dependency file
go
Pull requests that update Go code
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#1750
opened May 27, 2024 by
dependabot
bot
Loading…
🌱 Bump github.com/prometheus/client_golang from 1.19.0 to 1.19.1
dependencies
Pull requests that update a dependency file
go
Pull requests that update Go code
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#1727
opened May 13, 2024 by
dependabot
bot
Loading…
🌱 Bump kustomize version from v4 to v5
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#1718
opened May 3, 2024 by
peppi-lotta
Loading…
🌱 Refactoring: split update_opts.go and updateopts_test.go
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#1717
opened May 2, 2024 by
dtantsur
Loading…
✨ Host live updates - proof of concept
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
🌱 Mount ironic credentials as plain-text volumes instead of the ironic htpasswd environment variable
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#1685
opened Apr 18, 2024 by
MahnoorAsghar
Loading…
🌱 remove variables specific to ironic from bmo env file
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#1683
opened Apr 18, 2024 by
sathieu
Loading…
✨ Add Golang-based deploy-cli
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#1669
opened Apr 15, 2024 by
mquhuy
Loading…
🌱 DNM Testing
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#1665
opened Apr 11, 2024 by
iurygregory
Loading…
🌱 Separate upgrade plan from upgrade test
needs-rebase
Indicates that a PR cannot be merged because it has merge conflicts with HEAD.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#1637
opened Mar 27, 2024 by
jackjii79
Loading…
🌱 Improve deploy.sh to differentiate between build and run of kustomize
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#1622
opened Mar 14, 2024 by
CJCShadowsan
Loading…
🌱 added tests for loadTLSConfigFromEnv in factory_test.go
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#1589
opened Mar 4, 2024 by
danish9039
Loading…
ProTip!
Type g i on any issue or pull request to go back to the issue listing page.