Skip to content

Pull requests: pingcap/tiup

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

fix # cannot be included in grafana password size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#2468 opened Oct 31, 2024 by kaaaaaaang Loading…
add cdc server topylogy example size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#2466 opened Oct 29, 2024 by wk989898 Loading…
[DMN] playground: add dm support for playground do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2464 opened Oct 28, 2024 by siddontang Draft
disable --collector.interrupts lgtm size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#2463 opened Oct 18, 2024 by kaaaaaaang Loading…
playground: Fix typo and update size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#2454 opened Aug 22, 2024 by breezewish Loading…
Update --ssh desc size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#2380 opened Mar 6, 2024 by glkappe Loading…
Optimized the active judgment command size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#2378 opened Feb 27, 2024 by hackersean Loading…
cluster/tiflash: Remove deprecated config items do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#2357 opened Jan 10, 2024 by JaySon-Huang Draft v1.17.0
mkdir for raftdb-path lgtm needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#2198 opened May 8, 2023 by Smityz Loading…
skip destroy monitor when ignore_exporter is true needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#2197 opened May 6, 2023 by Smityz Loading…
[TiDB Dashboard] Playground deploys seperated dashboard server by default. Other improvements. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2091 opened Dec 2, 2022 by SabaPing Draft
cluster: support IngoreInitConfigComps size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#1987 opened Jul 14, 2022 by Smityz Loading…
tests: add ssh proxy testcases do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#1470 opened Jul 2, 2021 by 9547 Draft
Use alternative privilege escalation command to initialize the environment category/usability Categorizes issue or PR as a usability enhancement. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/new-feature Categorizes pr as related to a new feature.
#799 opened Sep 21, 2020 by darkelf21cn Loading…
ProTip! Filter pull requests by the default branch with base:master.