Fix Lint GH workflow (#1512) #289
deploy.devnet.yml
on: push
Build
/
Polygon Edge
2m 11s
Build
/
Verify Build Reproducibility
1m 52s
Snyk and Publish
/
Snyk and Publish
51s
Snyk and Publish
/
Snyk Code and Publish
36s
Test
/
Polygon Edge
15m 49s
Build/Push Container Image
1m 13s
Load Test
/
run_k6
Annotations
4 errors
Deploy DevNet
Process completed with exit code 254.
|
Build/Push Container Image
Process completed with exit code 1.
|
Load Test / run_k6
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 360 minutes.
|
Load Test / run_k6
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
polygon-edge
Expired
|
17.1 MB |
|