Skip to content

Sync from internal repo (2024-04-15) #40

Sync from internal repo (2024-04-15)

Sync from internal repo (2024-04-15) #40

Triggered via pull request April 15, 2024 13:19
Status Failure
Total duration 2m 50s
Artifacts

go.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Go 1.18: realtime_test.go#L55
undefined: context.WithoutCancel
Go 1.18
Process completed with exit code 2.
Go stable
The job was canceled because "_1_18" failed.
Go stable
The operation was canceled.