Skip to content

Connectd throttle #9964

Connectd throttle

Connectd throttle #9964

Triggered via pull request July 4, 2024 02:33
Status Failure
Total duration 53m 17s
Artifacts 4

ci.yaml

on: pull_request
Pre-build checks
10m 8s
Pre-build checks
Matrix: compile
Run fuzz regression tests
9m 5s
Run fuzz regression tests
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
CI completion
0s
CI completion
Fit to window
Zoom out
Zoom in

Annotations

26 errors
Sanitizers Test CLN (ASan/UBSan (03/10), --test-group=3 --test-group-count=10)
Process completed with exit code 1.
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The job was canceled because "ASan_UBSan__03_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (07/10), --test-group=7 --test-group-count=10)
The job was canceled because "ASan_UBSan__03_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (05/10), --test-group=5 --test-group-count=10)
The job was canceled because "ASan_UBSan__03_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (09/10), --test-group=9 --test-group-count=10)
The job was canceled because "ASan_UBSan__03_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (06/10), --test-group=6 --test-group-count=10)
The job was canceled because "ASan_UBSan__03_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (08/10), --test-group=8 --test-group-count=10)
The job was canceled because "ASan_UBSan__03_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (01/10), --test-group=1 --test-group-count=10)
The job was canceled because "ASan_UBSan__03_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (10/10), --test-group=10 --test-group-count=10)
The job was canceled because "ASan_UBSan__03_10__--test" failed.
Test CLN gcc
Process completed with exit code 1.
Test CLN clang
The job was canceled because "gcc_compile-gcc_sqlite3_g" failed.
Test CLN clang
The operation was canceled.
Test CLN liquid
The job was canceled because "gcc_compile-gcc_sqlite3_g" failed.
Test CLN liquid
The operation was canceled.
Test CLN splicing
The job was canceled because "gcc_compile-gcc_sqlite3_g" failed.
Test CLN splicing
The operation was canceled.
Test CLN postgres
The job was canceled because "gcc_compile-gcc_sqlite3_g" failed.
Test CLN postgres
The operation was canceled.

Artifacts

Produced during runtime
Name Size
cln-compile-clang-sanitizers.tar.bz2
172 MB
cln-compile-clang.tar.bz2
118 MB
cln-compile-gcc-O3.tar.bz2
146 MB
cln-compile-gcc.tar.bz2
117 MB