Skip to content

Commit

Permalink
reference to :ref: view_asset-data
Browse files Browse the repository at this point in the history
Signed-off-by: Victor Garcia Reolid <victor@seita.nl>
  • Loading branch information
victorgarcia98 committed Sep 20, 2023
1 parent cdb9b61 commit 15625b1
Showing 1 changed file with 2 additions and 0 deletions.
2 changes: 2 additions & 0 deletions documentation/tut/toy-example-expanded.rst
Original file line number Diff line number Diff line change
Expand Up @@ -115,6 +115,8 @@ In the case of the scheduler that we run in the previous tutorial, the PV is not
:align: center
|
.. note:: You can add arbitrary sensors to a chart using the attribute ``sensors_to_show``. See :ref: `view_asset-data` for more.

We hope this part of the tutorial shows how to incorporate a limited grid connection rather easily with FlexMeasures. There are more ways to model such settings, but this is a straightforward one.

This tutorial showed a quick way to add an inflexible load (like solar power) and a grid connection. In :ref:`tut_toy_schedule_process`, we'll turn to something different: the optimal timing of processes with fixed energy work and duration.
Expand Down

0 comments on commit 15625b1

Please sign in to comment.