Skip to content

Unit test smoke test #6

Unit test smoke test

Unit test smoke test #6

Manually triggered June 15, 2023 01:30
Status Failure
Total duration 20m 58s
Artifacts

smoke-test.yml

on: workflow_dispatch
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (3.9)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build (3.9)
The operation was canceled.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
The operation was canceled.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
The operation was canceled.