Skip to content
Triggered via push November 27, 2023 14:04
Status Failure
Total duration 9m 53s
Artifacts

go.yml

on: push
Matrix: build
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
coverage: catalog.go#L8
no required module provides package github.com/goccy/go-zetasqlite/internal; to add it:
coverage
Process completed with exit code 2.
test (ubuntu-latest, 1.18): catalog.go#L8
no required module provides package github.com/goccy/go-zetasqlite/internal; to add it:
test (ubuntu-latest, 1.18)
Process completed with exit code 1.
test (macos-latest, 1.18)
The job was canceled because "ubuntu-latest_1_18" failed.
test (macos-latest, 1.18)
The operation was canceled.
lint
Process completed with exit code 2.