Skip to content

Latest commit

 

History

History
43 lines (35 loc) · 3.11 KB

design-details-maximum-qty.md

File metadata and controls

43 lines (35 loc) · 3.11 KB
title description documentationcenter author ms.prod ms.topic ms.devlang ms.tgt_pltfrm ms.workload ms.search.keywords ms.date ms.author ms.translationtype ms.sourcegitcommit ms.openlocfilehash ms.contentlocale ms.lasthandoff
Design Details - Maximum Qty.
The Maximum Quantity policy is a way to maintain inventory using a reorder point.
SorenGP
dynamics-nav-2018
article
na
na
na
07/01/2017
sgroespe
HT
4fefaef7380ac10836fcac404eea006f55d8556f
eb2dfa933cd80400e3143c2c0b5bc44691170baf
en-au
10/16/2017

Design Details: Maximum Qty.

The Maximum Quantity policy is a way to maintain inventory using a reorder point.

Everything regarding the Fixed Reorder Qty. policy also applies to this policy. The only difference is the quantity of the suggested supply. When using the maximum quantity policy, the reorder quantity will be defined dynamically based on the projected inventory level and will therefore usually differ from order to order.

Calculated per Time Bucket

The reorder quantity is determined at the point of time (the end of a time bucket) when the planning system detects that the reorder point has been crossed. At this time, the system measures the gap from the current projected inventory level up to the specified maximum inventory. This constitutes the quantity that should be reordered. The system then checks if supply has already been ordered elsewhere to be received within the lead time and, if so, reduces the quantity of the new supply order by already ordered quantities.

The system will ensure that the projected inventory at least reaches the reorder point level – in case the user has forgotten to specify a maximum inventory quantity.

Combines with Order Modifiers

Depending on the setup, it may be best to combine the Maximum Quantity policy with order modifiers to ensure a minimum order quantity or round it to an integer number of purchase units of measure, or split it into more lots as defined by the maximum order quantity.

Combines with Calendars

Before suggesting a new supply order to meet a reorder point, the planning system checks if the order is scheduled for a non-working day, according to any calendars that are defined in the Base Calendar Code field in the Company Information and Location Card windows.

If the scheduled date is a non-working day, the planning system moves the order forward to the nearest working date. This may result in an order that meets a reorder point but does not meet some specific demand. For such unbalanced demand, the planning system creates an extra supply.

See Also

Design Details: Reordering Policies
Design Details: Planning Parameters
Design Details: Handling Reordering Policies
Design Details: Supply Planning