Skip to content

pre-commit

pre-commit #5

Triggered via push July 23, 2023 11:29
Status Failure
Total duration 21s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 24.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 24.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
The operation was canceled.