Skip to content

update Procfile

update Procfile #26

Triggered via push August 7, 2023 10:07
Status Failure
Total duration 22s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.11)
Process completed with exit code 1.
build (3.8)
The job was canceled because "_3_11" failed.
build (3.8)
The operation was canceled.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.
build (3.9)
The job was canceled because "_3_11" failed.
build (3.9)
The operation was canceled.