5:CONCEPT SELECTION
KMeghashree edited this page Mar 19, 2023
·
15 revisions
DESIGN OBJESCTIVE | WEIGHTS | DESIGN 1 | DESIGN 2 | DESIGN 3 |
---|---|---|---|---|
low cost | 3 | 2+ | 1+ | datum |
installation | 1 | 1- | 0 | datum |
saftey | 10 | 2+ | 1+ | datum |
ease of use | 4 | 1+ | 2+ | datum |
maintainance | 5 | 2- | 0 | datum |
space | 2 | 2+ | 1+ | datum |
less weight | 7 | 2+ | 1+ | datum |
speed | 9 | 1- | 0 | datum |
score(+) | ------ | 60 | 29 | ---- |
score(-) | ----- | 20 | 0 | ---- |
total | ----- | 40 | 29 | 0 |
objectives | score alloted | justification for score alloted |
---|---|---|
low cost | 3 | the price comes around a average cost |
installation | 1 | installation is done only one time |
safety | 10 | as it is a machine safety will be our top priority |
ease of use | 4 | as it is automatic it can be used by knowledge |
maintenance | 5 | it requires proper maintenance |
space | 2 | space doesnot required more |
less weight | 7 | maintaining the low weight of machine is important |
speed | 9 | as it is automatic machine speed will be high |
sl no | subsysytem |
---|---|
1 | handling unit |
2 | moving or sorting unit |
3 | releasing |
Subsystems | handling | moving and sorting | releasing | indication |
---|---|---|---|---|
handling | ----- | material | --- | ----- |
moving and sorting unit | ---- | ----- | spatial | ----- |
releasing | ----- | ----- | ------ | data |