Merge remote-tracking branch 'upstream/master' #54
build-docker.yml
on: push
config
1s
Matrix: build-docker
Matrix: run-release-test-workflow / test
Waiting for pending jobs
Annotations
9 errors
build-docker (ubuntu-latest, nvidia-ubuntu20.04)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c # Install requirements\n gosu user /opt/python/bin/pip3 install -r /tmp/requirements.txt\n" did not complete successfully: exit code: 1
|
build-docker (ubuntu-latest, nvidia)
The job was canceled because "ubuntu-latest_nvidia-ubuntu20_04" failed.
|
build-docker (ubuntu-latest, nvidia)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c # Install requirements\n gosu user /opt/python/bin/pip3 install -r /tmp/requirements.txt\n" did not complete successfully: exit code: 1
|
build-docker (ubuntu-latest, cpu-ubuntu20.04)
The job was canceled because "ubuntu-latest_nvidia-ubuntu20_04" failed.
|
build-docker (ubuntu-latest, cpu-ubuntu20.04)
The operation was canceled.
|
build-docker (ubuntu-latest)
The job was canceled because "ubuntu-latest_nvidia-ubuntu20_04" failed.
|
build-docker (ubuntu-latest)
The operation was canceled.
|
build-docker (ubuntu-latest, cpu)
The job was canceled because "ubuntu-latest_nvidia-ubuntu20_04" failed.
|
build-docker (ubuntu-latest, cpu)
The operation was canceled.
|