Skip to content

refactors examples

refactors examples #52

Triggered via push June 10, 2023 20:29
Status Failure
Total duration 1m 52s
Artifacts

build.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

23 errors
build (macos-latest, 3.9)
Process completed with exit code 1.
build (macos-latest, 3.8)
The job was canceled because "macos-latest_3_9" failed.
build (macos-latest, 3.8)
The operation was canceled.
build (ubuntu-latest, 3.8)
The job was canceled because "macos-latest_3_9" failed.
build (ubuntu-latest, 3.8)
The operation was canceled.
build (ubuntu-latest, 3.9)
The job was canceled because "macos-latest_3_9" failed.
build (ubuntu-latest, 3.9)
The operation was canceled.
build (macos-latest, 3.10)
The job was canceled because "macos-latest_3_9" failed.
build (macos-latest, 3.10)
The operation was canceled.
build (windows-latest, 3.8)
The job was canceled because "macos-latest_3_9" failed.
build (windows-latest, 3.8)
The operation was canceled.
build (macos-latest, 3.11)
The job was canceled because "macos-latest_3_9" failed.
build (macos-latest, 3.11)
The operation was canceled.
build (windows-latest, 3.9)
The job was canceled because "macos-latest_3_9" failed.
build (windows-latest, 3.9)
The operation was canceled.
build (windows-latest, 3.10)
The job was canceled because "macos-latest_3_9" failed.
build (windows-latest, 3.10)
The operation was canceled.
build (ubuntu-latest, 3.10)
The job was canceled because "macos-latest_3_9" failed.
build (ubuntu-latest, 3.10)
The operation was canceled.
build (windows-latest, 3.11)
The job was canceled because "macos-latest_3_9" failed.
build (windows-latest, 3.11)
The operation was canceled.
build (ubuntu-latest, 3.11)
The job was canceled because "macos-latest_3_9" failed.
build (ubuntu-latest, 3.11)
The operation was canceled.