Skip to content
Triggered via push January 5, 2024 18:47
Status Failure
Total duration 34s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

10 errors
build (1.19)
missing go.sum entry for module providing package github.com/google/go-cmp/cmp (imported by github.com/onsi/gomega); to add:
build (1.19)
Process completed with exit code 1.
build (1.18)
The job was canceled because "_1_19" failed.
build (1.18)
The operation was canceled.
build (1.20)
The job was canceled because "_1_19" failed.
build (1.20)
missing go.sum entry for module providing package github.com/google/go-cmp/cmp (imported by github.com/onsi/gomega); to add:
build (1.20)
The operation was canceled.
build (1.21)
The job was canceled because "_1_19" failed.
build (1.21)
missing go.sum entry for module providing package github.com/google/go-cmp/cmp (imported by github.com/onsi/gomega); to add:
build (1.21)
The operation was canceled.