Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

✨ Destination Google Sheets: include socat binary in docker image #30748

Merged
merged 2 commits into from Sep 25, 2023

Conversation

git-phu
Copy link
Contributor

@git-phu git-phu commented Sep 25, 2023

What

This is for

How

Build and publish destination Google Sheets to include socat in the docker image.
This will then be used in https://github.com/airbytehq/airbyte-platform-internal/pull/8870

🚨 User Impact 🚨

None from this PR alone (socat will be added to the image but won't be used until https://github.com/airbytehq/airbyte-platform-internal/pull/8870 is merged.)

@vercel
Copy link

vercel bot commented Sep 25, 2023

The latest updates on your projects. Learn more about Vercel for Git β†—οΈŽ

Name Status Preview Comments Updated (UTC)
airbyte-docs βœ… Ready (Inspect) Visit Preview πŸ’¬ Add feedback Sep 25, 2023 11:41pm

@octavia-squidington-iii octavia-squidington-iii added area/connectors Connector related issues area/documentation Improvements or additions to documentation connectors/destination/google-sheets labels Sep 25, 2023
@github-actions
Copy link
Contributor

github-actions bot commented Sep 25, 2023

Before Merging a Connector Pull Request

Wow! What a great pull request you have here! πŸŽ‰

To merge this PR, ensure the following has been done/considered for each connector added or updated:

  • PR name follows PR naming conventions
  • Breaking changes are considered. If a Breaking Change is being introduced, ensure an Airbyte engineer has created a Breaking Change Plan.
  • Connector version has been incremented in the Dockerfile and metadata.yaml according to our Semantic Versioning for Connectors guidelines
  • You've updated the connector's metadata.yaml file any other relevant changes, including a breakingChanges entry for major version bumps. See metadata.yaml docs
  • Secrets in the connector's spec are annotated with airbyte_secret
  • All documentation files are up to date. (README.md, bootstrap.md, docs.md, etc...)
  • Changelog updated in docs/integrations/<source or destination>/<name>.md with an entry for the new version. See changelog example
  • Migration guide updated in docs/integrations/<source or destination>/<name>-migrations.md with an entry for the new version, if the version is a breaking change. See migration guide example
  • If set, you've ensured the icon is present in the platform-internal repo. (Docs)

If the checklist is complete, but the CI check is failing,

  1. Check for hidden checklists in your PR description

  2. Toggle the github label checklist-action-run on/off to re-run the checklist CI.

@git-phu git-phu marked this pull request as ready for review September 25, 2023 23:40
@git-phu git-phu requested a review from a team September 25, 2023 23:41
@airbyte-oss-build-runner
Copy link
Collaborator

destination-google-sheets test report (commit f8738aa474) - βœ…

⏲️ Total pipeline duration: 02mn54s

Step Result
Connector package install βœ…
Build destination-google-sheets docker image for platform linux/x86_64 βœ…
Unit tests βœ…
Integration tests βœ…
Code format checks βœ…
Validate airbyte-integrations/connectors/destination-google-sheets/metadata.yaml βœ…
Connector version semver check βœ…
Connector version increment check βœ…
QA checks βœ…

πŸ”— View the logs here

☁️ View runs for commit in Dagger Cloud

Please note that tests are only run on PR ready for review. Please set your PR to draft mode to not flood the CI engine and upstream service on following commits.
You can run the same pipeline locally on this branch with the airbyte-ci tool with the following command

airbyte-ci connectors --name=destination-google-sheets test

@git-phu git-phu enabled auto-merge (squash) September 25, 2023 23:47
@git-phu git-phu merged commit 2cb6372 into master Sep 25, 2023
27 of 29 checks passed
@git-phu git-phu deleted the peter/socat-in-destination-google-sheets branch September 25, 2023 23:49
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
area/connectors Connector related issues area/documentation Improvements or additions to documentation connectors/destination/google-sheets
Projects
None yet
Development

Successfully merging this pull request may close these issues.

None yet

4 participants