Update build matrix for EOL #108
Annotations
4 warnings
test (3.0, spec/support/Gemfile.rails7, 2)
Failed to download action 'https://api.github.com/repos/ruby/setup-ruby/tarball/d4526a55538b775af234ba4af27118ed6f8f6677'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
test (3.0, spec/support/Gemfile.rails7, 2)
Back off 28.417 seconds before retry.
|
test (3.0, spec/support/Gemfile.rails7, 2)
Failed to download action 'https://api.github.com/repos/ruby/setup-ruby/tarball/d4526a55538b775af234ba4af27118ed6f8f6677'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
test (3.0, spec/support/Gemfile.rails7, 2)
Back off 27.679 seconds before retry.
|