Skip to content
This repository was archived by the owner on Jul 18, 2020. It is now read-only.

Latest commit

 

History

History
28 lines (24 loc) · 690 Bytes

roadmap.md

File metadata and controls

28 lines (24 loc) · 690 Bytes

Roadmap

Preliminary Datastore build - 12 weeks

  1. Basic smart contracts
  2. AragonOS integration
  3. Permissions support
  4. Set up IPFS servers
  5. Implement IPFS storage

Encryption integration - 12 weeks

  1. Keep integration
  2. Add encryption and hash algorithms
  3. Complete Datastore javascript interface
  4. Rigorous testing

Aragon Drive MVP - 8 weeks

  1. Finalize UX design
  2. Implement the folder structures
  3. Implement the sharing features
  4. Testing the Datastore with a real app
  5. Complete the Datastore documentation
  6. Testnet release of the Drive app

Aragon Drive Release - 4 weeks

  1. Comments support
  2. Labels support
  3. Testing of the app
  4. Mainnet release