Skip to content

Unit test improvement

No due date 80% complete

The main goals are:

  • Improving the testing workflow. Introducing test frameworks as required
  • Having tests for the existing code base. At least the lcd_logic project should be covered completely.
  • Introducing steps in the CI pipeline for running the tests.

The main goals are:

  • Improving the testing workflow. Introducing test frameworks as required
  • Having tests for the existing code base. At least the lcd_logic project should be covered completely.
  • Introducing steps in the CI pipeline for running the tests.
Loading