Skip to content

Vectorizer update

Vectorizer update #28

Triggered via push July 6, 2023 04:23
Status Failure
Total duration 34s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 30.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 30.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
The operation was canceled.