Incremental decommit #4143
ci-nix.yaml
on: pull_request
Matrix: Benchmarks
Matrix: Build & test
Build haddock using nix
1m 19s
Build specification using nix
3m 53s
nix flake check
4m 2s
Publish benchmark results
3s
Publish test results
0s
Documentation
0s
Annotations
10 errors
Build & test (hydra-plutus)
Process completed with exit code 1.
|
Build & test (plutus-merkle-tree)
The job was canceled because "hydra-plutus" failed.
|
Build & test (plutus-cbor)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-tui)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-tui)
The operation was canceled.
|
Build & test (hydra-node)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-node)
The operation was canceled.
|
Build & test (hydra-cluster)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-cluster)
The operation was canceled.
|
nix flake check
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
benchmarks-hydra-cluster-bench-e2e
|
764 Bytes |
|
benchmarks-hydra-node-micro
|
97.1 KB |
|
benchmarks-hydra-node-tx-cost
|
1.79 KB |
|
benchmarks-plutus-merkle-tree-on-chain-cost
|
437 Bytes |
|
haddocks
|
5.45 MB |
|
hydra-spec
|
797 KB |
|
test-results-plutus-cbor
|
709 Bytes |
|
test-results-plutus-merkle-tree
|
868 Bytes |
|