Skip to content

chore: upgrade skl-js-engine #78

chore: upgrade skl-js-engine

chore: upgrade skl-js-engine #78

Triggered via push June 28, 2023 23:52
Status Failure
Total duration 1m 0s
Artifacts

ci.yml

on: push
Matrix: test-unit
Matrix: test-integration-windows
Matrix: test-integration
coveralls
0s
coveralls
Fit to window
Zoom out
Zoom in

Annotations

19 errors
test-unit (ubuntu-latest, 14.15)
Process completed with exit code 1.
test-unit (ubuntu-latest, 14.x)
The job was canceled because "ubuntu-latest_14_15" failed.
test-unit (ubuntu-latest, 14.x)
Process completed with exit code 1.
test-integration (14.x)
Process completed with exit code 1.
test-unit (ubuntu-latest, 16.10)
The job was canceled because "ubuntu-latest_14_15" failed.
test-unit (ubuntu-latest, 16.10)
The operation was canceled.
test-unit (windows-latest, 14.15)
The job was canceled because "ubuntu-latest_14_15" failed.
test-unit (windows-latest, 14.15)
The operation was canceled.
test-unit (ubuntu-latest, 16.x)
The job was canceled because "ubuntu-latest_14_15" failed.
test-unit (ubuntu-latest, 16.x)
The operation was canceled.
test-unit (windows-latest, 14.x)
The job was canceled because "ubuntu-latest_14_15" failed.
test-unit (windows-latest, 14.x)
The operation was canceled.
test-unit (windows-latest, 16.x)
The job was canceled because "ubuntu-latest_14_15" failed.
test-unit (windows-latest, 16.x)
The operation was canceled.
test-integration-windows (14.x)
Process completed with exit code 1.
test-unit (windows-latest, 16.10)
The job was canceled because "ubuntu-latest_14_15" failed.
test-unit (windows-latest, 16.10)
The operation was canceled.
test-integration-windows (16.x)
The job was canceled because "_14_x" failed.
test-integration-windows (16.x)
The operation was canceled.