Skip to content

Merge pull request #45563 from vvoland/fix-45556 #134

Merge pull request #45563 from vvoland/fix-45556

Merge pull request #45563 from vvoland/fix-45556 #134

Triggered via push May 18, 2023 16:00
Status Failure
Total duration 2h 4m 26s
Artifacts 4

test.yml

on: push
validate-dco  /  run
27s
validate-dco / run
Matrix: build-dev
integration-cli-prepare
24s
integration-cli-prepare
prepare-smoke
8s
prepare-smoke
validate-prepare
8s
validate-prepare
Matrix: integration
Matrix: integration-cli
Matrix: smoke
Matrix: validate
integration-report
1m 7s
integration-report
unit-report
24s
unit-report
integration-cli-report
2m 15s
integration-cli-report
Fit to window
Zoom out
Zoom in

Annotations

2 errors
integration (ubuntu-22.04, systemd)
The job running on runner GitHub Actions 30 has exceeded the maximum execution time of 120 minutes.
integration (ubuntu-22.04, systemd)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
docker-py-reports Expired
3.57 MB
integration-cli-reports Expired
43.6 MB
integration-reports Expired
56.6 MB
unit-reports Expired
7.05 MB