Skip to content
This repository has been archived by the owner on Mar 28, 2024. It is now read-only.

Commit

Permalink
Create .readthedocs.yml
Browse files Browse the repository at this point in the history
  • Loading branch information
critical-path committed May 18, 2019
1 parent 6702db4 commit 803e706
Showing 1 changed file with 12 additions and 0 deletions.
12 changes: 12 additions & 0 deletions .readthedocs.yml
Original file line number Diff line number Diff line change
@@ -0,0 +1,12 @@
version: 2

sphinx:
configuration: docs/conf.py

formats:
- pdf

python:
install:
- method: pip
path: .

0 comments on commit 803e706

Please sign in to comment.