The list of services in the OBPS module refers to the various types of services offered to citizens or end-users. The Data Table below contains an indicative list of services and details required to configure the building plan approval module.
Sr. No. | Service Code* | Service Name* (In English) | Service Name (In Local Language) | Plan required for service * | Occupancy Certificate applicable for service | Plan Validity of this service (In Years)* | Renewal Validity of the service (in Years) |
---|---|---|---|---|---|---|---|
1 | NC | New Construction | | Yes | No | 2 | 2 |
2 | ADD | Addition | | Yes | Yes | 1 | 1 |
The data given in the table is sample data for reference.
Sr. No. | Column Name | Data Type | Data Size | Is Mandatory? | Description |
---|---|---|---|---|---|
1 | Service Code | Alphanumeric | 64 | Yes | Unique Identifier for the listed services for reference |
2 | Service Name (In English) | Text | 64 | Yes | Names of applicable services such as Permit for New Construction, Reconstruction, Alteration, or Demolition |
3 | Service Name (In Local Language) | Text | 64 | No | Service names in Local language |
4 | The plan required for service | Text | 3 | Yes | Building drawing (Plan) required to submit for the listed services. The radio button for marking Yes or No |
5 | Occupancy Certificate applicable for service | Text | 3 | No | Whether Occupancy Certificate requires to be generated for this service. Radio button to mark Yes or No |
6 | Plan validity for this service (In Years) | Integer | 2 | Yes | Define the validity period of the permit order generated for the listed service |
7 | Renewal Validity of the service (in Years) | Integer | 2 | No | It can be 1 or 2 or 3 years based on the State/ULB needs |
- Download the data template attached to this page.
- Refer to the ‘Data Definition’ section of this document to understand the headers in the template sheet, their data type, size, and definitions.
- Reach out to the person who shared the template for further details or to clear your doubts. Identify if the State/ULB has a provision for capturing pipe size for connections.
- Identify the services provided by the DIGIT OBPAS system and enter them into the template with other configurable parameters given in the template.
- Go through the checklist to verify the data. Make sure that each and every point mentioned in the checklist is covered.
The checklist is a set of activities to be performed once the data is filled into a template to ensure data entry requirements are met. These activities have been divided into 2 groups as given below.
This checklist covers all the activities which are common across the entities.
Sr. No. | Checklist Parameter | Example |
---|---|---|
1 | Make sure that each and every point in this reference list has been taken care of | Checklist |
There is no separate entity-specific checklist for this entity.
Configuration Data Templateconfiguration-data-template-list-of-services-2-.xlsx - 10KB
Sample Datasample-configuration-data-list-of-services.xlsx - 10KB
All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.