Skip to content

refactor: merge init and sync submodule #43

refactor: merge init and sync submodule

refactor: merge init and sync submodule #43

Triggered via push May 4, 2023 10:36
Status Cancelled
Total duration 36m 15s
Artifacts
Matrix: packer
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
packer (ubuntu-latest, 14.x)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
packer (ubuntu-latest, 14.x)
Process completed with exit code 143.
packer (windows-latest, 14.x)
Canceling since a higher priority waiting request for 'build-workspace' exists
packer (windows-latest, 14.x)
The operation was canceled.
packer (macos-latest, 14.x)
Canceling since a higher priority waiting request for 'build-workspace' exists
packer (macos-latest, 14.x)
The operation was canceled.
packer (macos-latest, 14.x)
Runner GitHub Actions 3 did not respond to a cancelation request with 00:05:00.