Expand Up @@ -20,21 +20,21 @@
and the green times of the traffic lights at common intersections
in a sumo network with a given route file (vehicles and bicycles).
- The parameters in the Webster's equation may need to be adjusted
- The parameters in the Webster's equation may need to be adjusted
according to the respective user case. Otherwise, worse results
may occur. E.g. saturation headway can affect the road capacity,
minimal green time or minimal cycle length.
- The allowed movements per lane in the network should correspond to
those in the respective signal group/phase. E.g. if through and
right movements are allowed in a phase, they should be able to
minimal green time or minimal cycle length.
- The allowed movements per lane in the network should correspond to
those in the respective signal group/phase. E.g. if through and
right movements are allowed in a phase, they should be able to
share their lanes without conflicts. Otherwise, worse results
may occur.
- Traffic lights without traffic flows will not be optimized.
- Flows are considered only for one hour, corresponding to
the Webster's equation. Using the option --begin to define the
the Webster's equation. Using the option --begin to define the
start time of the investigated one hour.
- PCE is used instead of the number of vehicles.
Expand All @@ -43,10 +43,10 @@
the respective flows will be equally divided into the corresponding
phases for calculating the green splits.
- If multiple major greens exist, the respective flows will be evenly
- If multiple major greens exist, the respective flows will be evenly
distributed in each major green.
- consider flows only with minor greens at a certain direction
- consider flows only with minor greens at a certain direction
- If the critical flow or the sum of the critical flows is larger than 1,
the optimal cycle length will be set to 120 sec which can be adjusted
in the option.