Stakeholders refer to the technical persons and end-users of the OBPS system. The Stakeholders Type masters list allows the registration of stakeholders in the OBPS system. The list of stakeholders varies from one State/ULB to another.
Sr. No. | Code* | Stakeholder Type Name* | Stakeholder Permit Validity (In Years) | Limitations on construction |
---|---|---|---|---|
1 | BLD | Builders | 2 | N/A |
2 | ARC | Architect | 2 | N/A |
3 | TPR | Town Planner | 5 | Can construct 3 floors building, up to a height of 300 mts. |
The data given in the table is sample data for reference.
Sr. No. | Column Name | Data Type | Data Size | Is Mandatory? | Description |
---|---|---|---|---|---|
1 | Code | Alphameric | 3 | Yes | Unique Code provided with respect to Stakeholders type. It can be alphabetical, numeric, and alphanumeric as well |
2 | Stakeholder Type Name | Text | 64 | Yes | Name provided for stakeholder type which is ideally the technical qualification of the person registering |
3 | Stakeholder Permit Validity (In Years) | Numeric | 64 | No | All the permits (Permits to the stakeholders) have a validity period within which he/she is authorized |
4 | Limitations on construction | Text | 612 | No | Building Bye-laws defines and permits the limitations on the type of construction any technical person can take up to. This field captures such information |
- Download the data template attached to this page.
- Refer to the ‘Data Definition’ section of this document to understand the headers in the template sheet, their data type, size, and definitions.
- Reach out to the person who shared the template for further details or to clear your doubts. Identify if the State/ULB has a provision for capturing pipe size for connections.
- Identify the stakeholders and fill into the given template. Refer to the National Bye-Laws for more details on stakeholder types and defined limitations.
- Go through the checklist to verify the data. Make sure that each and every point mentioned in the checklist is covered.
The checklist is a set of activities to be performed once the data is filled into a template to ensure data entry requirements are met. These activities have been divided into 2 groups as given below.
This checklist covers all the activities which are common across the entities.
Sr. No. | Checklist Parameter | Example |
---|---|---|
1 | Make sure that each and every point in this reference list has been taken care of | Checklist |
There is no separate entity-specific checklist for this entity.
{% file src="../../../../.gitbook/assets/Configurable Data Template - Stakeholder Type_V1.xlsx" %}
{% file src="../../../../.gitbook/assets/Sample configuration data - Stakeholder Type.xlsx" %}
All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.