Skip to content

Commit

Permalink
remove proposed qualifier for ecotone upgrade
Browse files Browse the repository at this point in the history
  • Loading branch information
geoknee committed Apr 5, 2024
1 parent cd36a39 commit dc1d1b2
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion specs/protocol/superchain-upgrades.md
Original file line number Diff line number Diff line change
Expand Up @@ -256,7 +256,7 @@ but the matching L1-origin information may not be present at the time of activat
[Governance Proposal](https://gov.optimism.io/t/final-upgrade-proposal-2-canyon-network-upgrade/7088).
- `v5.0.0`: 2024 Feb 22nd - Delta network upgrade (Span Batches).
[Governance Proposal](https://gov.optimism.io/t/final-upgrade-proposal-3-delta-network-upgrade/7310).
- `v6.0.0`: 2024 Mar 14th - _Proposed_ Ecotone network upgrade (4844 Blob Batches + Cancun).
- `v6.0.0`: 2024 Mar 14th - Ecotone network upgrade (4844 Blob Batches + Cancun).
Still under review by governance.
[Governance Proposal](https://gov.optimism.io/t/upgrade-proposal-5-ecotone-network-upgrade/7669).

Expand Down

0 comments on commit dc1d1b2

Please sign in to comment.