Based on the user settings, there are more options to modify the date. The pop-up calendar and the tools to modify the date can be found in the top left-hand corner. It is possible to increase or decrease the date with units of time (day, week, month). Besides, a date can be chosen from the pop-up calendar also. The inline calendar can be found below the worklog table on the right-hand side of the input fields block. The settings make it possible to use both types of calendars simultaneously.

The Calendar highlights funtion

The calendar coloring function has been extended. The exclude dates shows like weekend (colored with red). The other months weekend fonts is colored to pink. The dates that include worklog now appears with yellow background.

Popup Calendar

Popup Calendar