You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
With an eye on the nv22 migration we need to land the migration-integration and run benchmarks on the nv22 DDO-migration.
Performance
The migration should run in < 1 min for SPs with good hardware, < 5 mins for most users, and < 2 hours for all cases (including archival nodes). Additionally, the node's memory usage during the migration period should not cause the node to fall out of sync.
The content you are editing has changed. Please copy your edits and refresh the page.
With an eye on the nv22 migration we need to land the migration-integration and run benchmarks on the nv22 DDO-migration.
Performance
The migration should run in < 1 min for SPs with good hardware, < 5 mins for most users, and < 2 hours for all cases (including archival nodes). Additionally, the node's memory usage during the migration period should not cause the node to fall out of sync.
Tasks
The text was updated successfully, but these errors were encountered: