Once Start is selected a "Select Quantity" pop up is shown with no option of "Material Consumption"
If the “Skip Material Transfer to WIP Warehouse” in Works order, is not checked then the “Material Consumption” button does show up. If it is checked then it does not show up.
Skip Material Transfer to WIP WarehouseNOT enabled then once submitted Start and Material Consumption can be selected as per the documentation.
Skip Material Transfer to WIP WarehouseIS enabled then once submitted Start and Material Consumption are not available and the only available option is Finish
Information about bug
In Manufacturing Settings Raw Materials Consumption is ticked and enabled.
According to the documentation, https://docs.erpnext.com/docs/v13/user/manual/en/manufacturing/articles/material_consumption, "Once enabled, a Material Consumption button will be available in Work Order once started."
Once Start is selected a "Select Quantity" pop up is shown with no option of "Material Consumption"
If the “Skip Material Transfer to WIP Warehouse” in Works order, is not checked then the “Material Consumption” button does show up. If it is checked then it does not show up.
This has been discussed in the forum https://discuss.erpnext.com/t/manufacturing-issues-in-version-11/47349/3
Module
manufacturing
Version
ERPNext: v13.16.1 (version-13)
Frappe Framework: v13.16.0 (version-13)
Installation method
manual install
Relevant log output / Stack trace / Full Error Message.
No response