Development of ACM0002: Grid-Connected Electricity Generation from Renewable Sources #2875
Labels
documentation
Improvements or additions to documentation
Epic
policy addition
When a new policy is created
technical task
Problem description
The primary objective of ACM0002 is to provide a structured approach for grid-connected electricity generation from renewable sources. This policy applies to grid-connected renewable energy generation project activities that include:
(a) Construction and operation of a Greenfield power plant; or
(b) Retrofitting, rehabilitation (or refurbishment), replacement or capacity addition of an existing power plant.
Further, the policy applies to grid-connected renewable energy generation project activities which integrate Battery Energy Storage System (BESS) to a Greenfield power plant or to an existing solar photovoltaic or wind power plant.
Requirements
Development of the policy with all details mentioned in the design schema.
Tools involved in this policy also needs to be developed. The tools are listed below:
Definition of done
Acceptance criteria
The text was updated successfully, but these errors were encountered: