Skip to content
This repository has been archived by the owner on Jun 27, 2024. It is now read-only.

Testing reusable flow 43 #21

Testing reusable flow 43

Testing reusable flow 43 #21

Triggered via push May 22, 2023 21:46
Status Failure
Total duration 4m 12s
Artifacts

run-lab.yml

on: push
e2e  /  e2e-preparations
4s
e2e / e2e-preparations
Fit to window
Zoom out
Zoom in

Annotations

1 error and 2 warnings
e2e / e2e-tests-local
Process completed with exit code 5.
e2e / e2e-tests-local
Docker logs fail with exit code 1
e2e / e2e-tests-local
Docker network rm failed with exit code 1