Skip to content

improve

improve #28

Triggered via push December 21, 2023 02:12
Status Failure
Total duration 6h 0m 32s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

16 errors
build (cassandra, 8)
Process completed with exit code 1.
build (cassandra, 11)
Process completed with exit code 1.
build (hbase, 8)
Process completed with exit code 1.
build (hbase, 11)
Process completed with exit code 1.
build (scylladb, 8)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
build (scylladb, 8)
The operation was canceled.
build (mysql, 8)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
build (mysql, 8)
The operation was canceled.
build (postgresql, 11)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 360 minutes.
build (postgresql, 11)
The operation was canceled.
build (postgresql, 8)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 360 minutes.
build (postgresql, 8)
The operation was canceled.
build (scylladb, 11)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
build (scylladb, 11)
The operation was canceled.
build (mysql, 11)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 360 minutes.
build (mysql, 11)
The operation was canceled.