Skip to content

Integration tests

Integration tests #98

Triggered via schedule August 15, 2023 16:27
Status Failure
Total duration 17m 45s
Artifacts

test-integration.yml

on: schedule
Matrix: tests-windows
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

8 errors
tests (ubuntu-20.04)
github.com/crate-crypto/go-kzg-4844@v0.3.0: read "https:/proxy.golang.org/@v/v0.3.0.zip": read tcp 10.1.0.39:59622->142.250.113.128:443: read: connection reset by peer
tests (ubuntu-20.04)
github.com/RoaringBitmap/roaring@v1.2.3: read "https:/proxy.golang.org/@v/v1.2.3.zip": read tcp 10.1.0.39:59622->142.250.113.128:443: read: connection reset by peer
tests (ubuntu-20.04)
github.com/RoaringBitmap/roaring@v1.2.3: read "https:/proxy.golang.org/@v/v1.2.3.zip": read tcp 10.1.0.39:59622->142.250.113.128:443: read: connection reset by peer
tests (ubuntu-20.04)
github.com/RoaringBitmap/roaring@v1.2.3: read "https:/proxy.golang.org/@v/v1.2.3.zip": read tcp 10.1.0.39:59622->142.250.113.128:443: read: connection reset by peer
tests (ubuntu-20.04)
Process completed with exit code 2.
tests (macos-11)
The job was canceled because "ubuntu-20_04" failed.
tests (macos-11)
The operation was canceled.
tests-windows (windows-2022)
Process completed with exit code 1.